Return to More Cases

Yanjin County Government Heating Project Water Pipe D-type Gas Boiler

Apr 06,2025

This project includes one 14MW and two 7MW offset gas-fired hot water boilers, which are supporting boilers for the Yanjin County government heating project.

The boiler and its auxiliary supporting boilers are composed of two modular container combinations. The main module includes: the boiler body, burner, natural gas valve group, pressure regulator valve group, control cabinet and detection, burner and blower connecting flue, connecting water pipes, etc. The auxiliary module includes: condensing energy saver, recirculation flue, connecting flue and chimney, connecting water pipes, etc. The two modules have the same height and length, and after being tightly connected on site, they become one. On site, only the necessary water supply interface, return water interface, flue interface, gas interface, power distribution interface and control interface need to be connected before it can be put into operation.

TAG: